The Group extended its construction business into civil infrastructure in 2019 with the acquisition of CES_SDC Pte Ltd (“CES_SDC”) (formerly known as Sembcorp Design and Construction Pte Ltd). A design and build construction service provider with an established track record in civil, industrial and utilities infrastructure projects, CES_SDC offers a wide spectrum of engineering and construction services from tunnel boring to modular construction, and is capable of providing customised solutions to meet the diverse needs of clients. CES_SDC possesses the highest A1 grading in General Building and Civil Engineering, as well as the highest L6 grading in Electrical Engineering and Integrated Building Services from Building and Construction Authority which allows it to tender for public sector projects of unlimited contract value.
PROJECTS
Contract 1 – Civil and External Sewer Works for Reconstruction of Choa Chu Kang Waterworks
Client: Public Utilities Board
Description: Description: Reconstruction of some of the aging facilities in the Pre-treatment area and construction of new Post-treatment buildings and facilities on a new plot of land to replace the remaining existing aged facilities. Scope includes civil, external underground Building Services and building lightning protection system.
Completion date: 2028 (expected)
Contract P102 Design and Construction of Elias Station and Tunnels for CRL-Punggol Extension
(CES_SDC – Chip Eng Seng Contractors (1988) JV)
Client: Land Transport Authority
Description: Design and Construction of Elias Station and Tunnels for CRL-Punggol Extension comprising of one Retrieval Shaft, one Launch Shaft, Cut and Cover Tunnel and 1.4km Twin Bored Tunnel drive passing below several HDB Blocks, Sungei Api Api Bridge and under CR109 TunnelCompletion date: 2031 (expected)
Contract J107 – Gek Poh Station, Tawas Station and Viaduct for Jurong Region Line
Client: Land Transport Authority
Description: Design, construction and completion of two elevated stations JW1 and JW2, as well as two elevated MRT viaducts with a total length of 1.3km
Completion date: 2026 (expected)
Tuas Water Reclamation Plant Contract 4B – Digestion Pre-Treatment and Sidestream Nitrogen Removal Facilities (CES_Salcon-SDC JV)
Client: Public Utilities Board
Description: Design, build, testing and commissioning of digestion pre-treatment and sidestream nitrogen removal facilities, as well as operation and maintenance of facilities for one year after completion
Completion date: 2026 (expected)
Tuas Water Reclamation Plant Contract 4A – Biosolids and Digesters)
Client: Public Utilities Board
Description: Construction of biosolids building and digesters, supply and installation of biosolids treatment and biogas handling equipment, testing, and commissioning of facilities, as well as operation and maintenance of facilities for one year after completion
Completion date: 2025 (expected)
Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport (Hock Lian Seng – SDC JV)
Client: Changi Airport Group
Description: Construction of new pavement works and refurbishment of existing Runway 2, drainages, external mechanical & electrical works, as well as security fencing and ancillary buildings around Runway 2 including specialist airfield instruments works
Completion date: 2024 (expected)
Contract T227 – Marina South Station & Tunnels for Thomson Line (SinoHydro – SDC JV)
Client: Land Transport Authority
Description: Construction of Marina South Station comprising a three-level underground station with twin bored tunnels to Marina Bay Station as well as cut and cover tunnels to Gardens by the Bay Station (Depth of excavation is about 26m)
Completion date: 2024 (expected)
Changi Water Reclamation Plant Phase 2 (Contract C22A – Foundation Works for Train 5)
Client: Public Utilities Board
Description: Construction of pile foundations, sheet piling, earth retaining and stabilisation structures (ERSS), soil stabilisation, bulk excavation and backfilling works
Completion date: 2021
MOE office at 51 Grange Road
Client: Ministry of Education
Description: Designed using Design for Manufacture and Assembly (DfMA) and Building Information Modelling (BIM), and constructed using Prefabricated Prefinished Volumetric Construction (PPVC)
Completion date: 2016
NTUC My First Skool mega childcare centre 1 at Jurong West
Client: NTUC First Campus Co-Operative Ltd
Description: Designed using Design for Manufacture and Assembly (DfMA) and Building Information Modelling (BIM), and constructed using Prefabricated Prefinished Volumetric Construction (PPVC)
Completion date: 2016
NTUC My First Skool mega childcare centre 2 at Fernvale Link
Client: NTUC First Campus Co-Operative Ltd
Description: Designed using Design for Manufacture and Assembly (DfMA) and Building Information Modelling (BIM), and constructed using Prefabricated Prefinished Volumetric Construction (PPVC)
Completion date: 2016
225M gas-fired combined cycle power facility in Myanmar (JEL – SDCIM Consortium)
Client: Sembcorp Myingyan Power Company Limited
Description: Engineering, procurement and construction of 225-megawatt gas-fired combined cycle power facility comprising two sets of GE 6F.03 gas turbine with generators, two HRSGs and one steam turbine with its generator, 2-storey administration & control building, cooling tower & ancillary buildings
Completion date: 2019
JTC Aviation 2 @ Seletar Aerospace Park
Client: Jurong Town Corporation
Description: Design and construction of 10/11-storey commercial and light industrial building with one level of basement and a connecting bridge to JTC Aviation One
Completion date: 2016
Singpost Regional eCommerce Logistics Hub
Client: Singpost Investments (Ecommerce Logistics) Pte Ltd
Description: Design and construction of a 4-storey logistic facility and warehouse and an 8-storey building consisting of warehouse, canteen and ancillary offices at Greenwich Drive/Tampines Road
Completion date: 2016
Narrow body 2-bay aircraft hangar at Changi
Client: ST Aerospace Services Co Pte Ltd
Description: Design and construction of a hangar to house two narrow body planes such as B737 and A321; main hangar is designed with single volume
Completion date: 2013
Sembcorp Woodchip Boiler Plant 1 & 2 at Jurong Island
Client: Sembcorp Cogen Pte Ltd
Description: Engineering, procurement & construction of civil & structural, architectural and building services works for Sembcorp’s first renewable energy plant that produces 60 tonnes per hour of steam from waste wood incineration
Completion date: 2013
Integrated Wastewater Treatment Plant @ Banyan at Jurong Island
Client: Hitachi Plant Technologies Pte Ltd
Description: Engineering, procurement & construction of civil & structural, architectural and building services works for an industrial wastewater treatment plant that can treat multiple streams of complex industrial wastewater
Completion date: 2012
Changi NEWater Plant
Client: Sembcorp NEWater Pte Ltd
Description: Engineering, procurement & construction of civil & structural, architectural and building services works for a NEWater plant that is capable of producing 228,000 cubic metres of NEWater per day
Completion date: 2010
Service corridor expansion pipelines at Jurong Island
Client: Sembcorp Industries Ltd
Description: Engineering, procurement & construction of civil & structural works including fencing and gates, pipe sleepers, pipe racks and pipe bridges, etc.
Completion date: 2012